The tire is pyrolyzed into oil vapor, which is then cooled into fuel oil, and crude carbon black is obtained at the same time. The biggest advantage of the two-in-one equipment is continuous production. When main furnace No.1 is running, main furnace No.2 can complete feeding. After the pyrolysis of furnace No.1 is finished, close the valve between steam drum No.1 and condenser, open valve No.2 to start furnace No.2. Furnace No.1 cools for about three hours for slag discharge, and vice versa, so as to realize non-stop production all day. Packaging and Shipping: The cracking equipment requires 2 frames and 2 ×40ft high cube containers for overseas transportation. The vertical condenser can be disassembled and loaded into containers, greatly saving transportation cost.
| Main Furnace Size | Φ2600×7700 |
| Applicable Raw Materials | Waste tires, oil sludge |
| Waste Tire Processing Capacity | 10‑12 tons per furnace |
| Oil Sludge Processing Capacity | 20 tons per furnace |
| Working Temperature | ‑20‑400℃ |
| Floor Area | 12m×24m |
| Total Power | 38KW |
Maintain a leading position in industry technology, drive industrial development, and deliver better products to serve customers.