Two in one vertical cooling cracking equipment

Two in one vertical cooling cracking equipment

View More

Product Introduction

JZQ-TP10-2H1L

The tire is pyrolyzed into oil vapor, which is then cooled into fuel oil, and crude carbon black is obtained at the same time. The biggest advantage of the two-in-one equipment is continuous production. When main furnace No.1 is running, main furnace No.2 can complete feeding. After the pyrolysis of furnace No.1 is finished, close the valve between steam drum No.1 and condenser, open valve No.2 to start furnace No.2. Furnace No.1 cools for about three hours for slag discharge, and vice versa, so as to realize non-stop production all day. Packaging and Shipping: The cracking equipment requires 2 frames and 2 ×40ft high cube containers for overseas transportation. The vertical condenser can be disassembled and loaded into containers, greatly saving transportation cost.

Equipment Parameters

Main Furnace SizeΦ2600×7700
Applicable Raw MaterialsWaste tires, oil sludge
Waste Tire Processing Capacity10‑12 tons per furnace
Oil Sludge Processing Capacity20 tons per furnace
Working Temperature‑20‑400℃
Floor Area12m×24m
Total Power38KW
Online Message

Maintain a leading position in industry technology, drive industrial development, and deliver better products to serve customers.

Make Cities Cleaner, Make Lives Better.

Growing your
business with us

We will add your information to our records to contact you regarding your request. For more information, please consult our privacy policy.